This project consisted of Phase 1 of an industrial corporate build-out at the Canterfield Corporate Campus site on the east side of route 31 connected to the intersection of IL-31 and Canterfield Parkway in the Village of West Dundee, Illinois with Transwestern Development Company and Triumph Construction Services Corporation. Phase 1 consisted of the development of an approximately 250,000 SF spec industrial building on Lot 1 and one 250,000 SF Build-To-Suit Industrial building on Lot 2 with a R.O.W. expansion of Canterfield Parkway to service both building sites and IL-31 Signalization design. The Manhard Consulting Team was tasked with performing on-site civil engineering design, infrastructure engineering design, master stormwater, surveying, and landscape architecture services from the initial land planning and entitlements phase all the way through construction.
This project offered unique challenges being the first phase of a master development in understanding how the first phase works with the surrounding master development land and vision and ensuring that design decisions made in this initial phase have a positive impact on the overall master development strategy and allow for ease of future development on-site. Master stormwater design and considerations were a key component to the design process, along with working closely with the Landowner and development team on the overall master design vision, and closely with Village staff and the construction team on implementation throughout the design, approval, and construction process.